Tri-State Design, working as a subconsultant to a major consulting firm, was responsible for the in-depth inspection and rehabilitation design on the following three structures:
- Market Street Bridge
- Stanwix Street Bridge
- Retaining Wall along WB Parkway West
The findings of the field inspection further refined the magnitude of the final design for this fast-track project. Tri-State was responsible for the complete rehabilitation design, and construction phase services during the construction phase of this contract.