This project consisted of the replacement design for a group of 4 minor bridges within Allegheny County, with a combined total construction cost of $1.2 million.
Girty’s Run Bridge No. 14 (GI14), Ross Township
Wible Run Bridge No. 5 (WB05), Shaler Township
Homeville Creek Bridge 10 (HV10), Munhall Borough
Licks Run Bridge 10 (LC10), South Park Township
Tri-State’s scope of services included field surveys, environmental studies (CE’s), hydraulic and hydrologic studies and reports, erosion and sedimentation control plans and narrative; stormwater drainage improvements, utility investigations, maintenance and protection of traffic plans, roadway design, replacement bridge design, and other requested activities.
Our scope of services for the above project included initial and biannual inspection of these bridges.